EPD → DPP Pipeline

The complete pipeline from Environmental Product Declaration to Digital Product Passport

ESPR 2024 requires a live, scannable DPP — not a static EPD document. Floilan automates every step of the conversion, from data extraction to passport publication.

< 5 min

EPD to live DPP

200+

compliance checks run

40+

EPD fields extracted

100%

ESPR schema coverage

How the pipeline works

Five automated stages replace a process that used to take compliance teams days.

STEP 01

EPD ingestion

Upload PDF or connect your EPD programme operator API. Floilan accepts ISO 14025 PDFs, ILCD+EPD XML, and live programme feeds from EPD Norway, IBU, and BRE.

STEP 02

Structured data extraction

Our OCR and NLP pipeline parses every lifecycle stage (A1–D), material declarations, programme metadata, and declared units into a typed data model validated against EN 15804.

STEP 03

Supply chain data enrichment

EPD data is combined with upstream supplier data collected via the Floilan portal — filling gaps in material provenance, restricted substance declarations, and end-of-life routes.

STEP 04

ESPR schema mapping & validation

The enriched dataset is mapped to the ESPR 2024 DPP data model. Our rules engine performs 200+ compliance checks and flags any missing mandatory fields before publication.

STEP 05

Live DPP publication

A regulator-ready Digital Product Passport is published with a permanent QR code, NFC tag option, and shareable URL. Auditors, OEMs, and specifiers access live data — not a PDF snapshot.

Manual process vs. Floilan

ManualFloilan
EPD to published DPP3–5 days< 5 minutes
Data entry errorsCommonEliminated
Audit readinessInconsistentAlways ready
QR code generationManual / noneAutomatic
Supply chain gapsUnresolvedFilled via portal
Regulatory updatesManual reworkAuto schema updates

Customers who made the switch

ConstructionFrameWorks Ltd

68% reduction in EPD preparation time — 3 days down to 5 minutes per product.

Read full case study →
BatteriesNovaBatt UK

12,000 cells passported in 6 weeks. OEM contract secured — supplier was first to arrive with a compliant DPP.

Read full case study →

Stop spending days on what should take minutes

Book a demo and watch us take one of your EPDs all the way to a published DPP, live on the call.

Book a live demo